Heres yesterdays /this mornings progress. Not very much, trying to get my head around how to set up ys-x6 and herkules.
Ive assembled the frame, the cage has been left off so i cant work on the electronics. I had been planning on running it as a + configuration rather than an x, as seen here. That would have allowed me to run the leds on paralell arms.
But a few problems i ran into. ys-x6 led mounting, I wanted it at that back for best visibility and looks, I would rathter not have it off set to one side

and the skyjib battery mounts which aren't on here but bolt on to either side of the fame. They would have been at 1 and 6 o'clock. It shouldn't have been to much of an issue for weight distribution. But it would have been strange. Now they will bolt on at 9 and 3 o'clock.
I enlarged the hole on top of the crash cage to install the emcotec magnet.
Thanks to Elflier for covering two of my booms in fluro hanger 9 ultra cote. I spent 6 hours trying to get a good finish and couldn't. So I asked a pro
View attachment 8939View attachment 8940View attachment 8941View attachment 8942